News and Improvements in Facilities and Services

  • 7/February/2025
  • Category: Port

Only continuous maintenance and improvement can ensure that you can always come to the Club to enjoy your boat with all the comfort and safety you deserve. That is why we are starting 2025 with a new action plan that includes over 160 planned actions.

Discover the main ones!

Taking advantage of the months with lower occupancy, the Club team is working on maintaining the docks and walkways.

The tasks include checking and adjusting mooring systems, chains, and shackles, as well as repairing wood, bollards, cleats, and protective rubbers.

This year, new safety towers equipped with fire extinguishers and life rings will also be installed on all pontoons. The service towers and bollards on dock G and the wooden pavement on walkways H, I, and J in Clota Petita will be renewed.

One of the areas being reviewed in various aspects is the Club’s service station, where the following improvements will be introduced:

    • Renovation of the toilets and their doors, which will now have access codes.
    • Replacement of the defense with a white one arranged in vertical segments designed to provide the best protection for small boats and jet skis.
    • Optimization of the diesel supply system to speed up the service.
    • Incorporation of a new potable water tower to supply boats in transit.

So that you can enjoy the Club’s facilities with the best comfort, this 2025:

    • New access stairs to the western breakwater have been installed on docks G and A.
    • An accessibility crane is planned to be added to the waiting dock.
    • The printed pavement in the area of the social headquarters has been repaired, enhancing its safety while looking like new.

Check out all the marina facilities!

What news do you want to see:

18.7º C

Vent: 184 S 8.6Kts, 17.9 Max

image description